You can find on this page excerpts or full-length articles, publications or conference papers referring to projects
using ITP technology and products. Do not hesitate to contact us if you want to more details on a specific paper
or if you have questions on ITP system.
“The Rosa field is located offshore Angola at a distance of 10 to 16 kilometers from the spread-moored Girassol
FPSO. Water depth in the area is about 1,350 meters. The Rosa Development Project proposes to tieback the
Rosa wells to the Girassol FPSO. This project had to handle new challenges in deepwater West Africa: very
stringent flow assurance requirements and cool down criteria for subsea production system, for long-length
flowlines and for risers in cold environment.
This paper describes the concepts and technologies selected, then the analyses and tests performed for design
qualification. Lessons learned from the Rosa experience are shown, in particular regarding passive thermal
insulation.”
-
2005 – OPT Conference and Exhibition – TOTAL and WEATHERFORD - Scale assessment pigging of the
TOTAL DUNBAR 16” Multi-phase Pipeline
“The 16” Dunbar Pipeline, operated by TOTAL E&P UK PLC, transports raw multi-phase fluids 22km from the
Dunbar platform to the North Alwyn Bravo platform in the North Sea. The pipeline was commissioned in 1994
and a metal lossinspection with an intelligent pig was successfully completed in 1997.
Video inspections of the pipeline conducted in recent years indicated a significant deposition of scale in the
topside and riser pipework at the Dunbar platform. Initial attempts to assess the extent of the scale build-up in
the risers and pipeline were only partially successful, and by the summer of 2003 the deposition was estimated
to have restricted the remaining internal diameter at the top of the riser to less than 10”.
[…]
This paper, jointly presented by Weatherford and TOTAL, describes the development work undertaken, as well
as summarising the results of the inspection runs carried out with both SAAM and the caliper pig during 2004.”
-
2006– Offshore Magazine May 06 – North Sea Forvie field overcomes technical challenges of long-distance
pipe-in-pipe
“The choice of pipe-in-pipe for this project was critical not just in terms of flow assurance, but also due to
offshore installation issues. With demand for pipelay vessels at near-record levels, laying spreads can be
difficult to secure for fasttrack projects. This meant that Forvie’s pipe-in-pipe had to be installable by each North
Sea offshore contractor. Moreover, the field jointing process had to be as rapid as possible in order to shorten
the required pipelay window (thereby increasing the potential vessel availability”
-
2006 – Batuque June 06 – ROSA – Innovating Technologies
« Suivant le schéma de développement choisi pour Rosa, la production du champ sera amenée par conduites
sous-marines sur le FPSO de Girassol, éloigné de 15 à 20km, pour y être traitée et stockée.
La température ambiante sur le fond marin n’est que de 4°C. Or, afin d’éviter tout risque de bouchage par
formation d’hydrates, notamment en cas d’arrêt prolongé de la production, la température du brut (environ 50°C à la sortie des puits) ne doit pas descendre en dessous de 20°C, ce qui impose que les têtes de puits, les
manifolds et les conduites de production soient suffisamment isolées du milieu marin. Pour cela, un concept
innovant a été développé : les conduites de production sont constituées de 2 tubes concentriques (technologie
pipe-in-pipe) entre lesquels un isolant a été placé et le vide réalisé. Le raccordement des éléments de
conduites utilise le concept original ITP de swaged joints »
-
2007– Offshore Engineer Feb 07 – HFI finds favour for Forvie pipe-in-pipe
“A specially insulated pipe-in-pipe with seamless inner pipes and outer HFI-pipes was designed and installed to
avoid hydrate build-up during transport of production from the Forvie North gas field to the host Alwyn North
platform in the Northern North Sea. “
-
-
-
- 2007 – Offshore Mediterranean Conference and Exhibition (OMC) – How to manufacture a world class
product in a remote location
- 2007 – Offshore Mediterranean Conference and Exhibition (OMC) – When high oil prices push fast track
subsea developments: the TOTAL Forvie North project
- 2007– 5th PetroMin Deepwater and Subsea Technology Conference and Exhibition - Going into 2000m+
waters: Are pipe-in-pipes getting too heavy for installation?
- 2007– 5th PetroMin Deepwater and Subsea Technology Conference and Exhibition - Long-distance stepout
– how far can we go ?